Thursday 8 December 2011

Group Meeting 8

(Blogger post created and uploaded by: OLIVER DOLTON)

Today the group met to piece together the final project. We used Adobe Premier pro to import all of our work files that we had rendered into F4V. Once these files had been imported we placed them on the timeline and selected a sound piece that we decided would be suitable for the final video.
The video was then rendered into a final project video as an F4V video format file ready for showing to be marked on 9th December 2011

Group Meeting 7

(Blogger post created and uploaded by: OLIVER DOLTON)

Today the group met to arrange how the rendering process was going to be completed. We came to the conclusion that each all of us would render our own work individually into a F4V format so that the these files could then be imported in premier pro later on and the final video can be linked together. The sound that we will use for the entire duration of the video is still yet to be confirmed.

·         Elliot will be rendering the lower section of the building



·         Jo will be rendering the outside of the building



·         Oliver will be rendering the upper floor and right side of the lower building (right of pathway).