Project Construction Process

(Blogger post created and uploaded by: OLIVER DOLTON)

The project construction process will be developed in 3 stages by 3 different members of the group has follows.
Jo Muhusay
Jo will be constructing and developing the outside of the Guildhall. She will be solely responsible for the modelling and animation process of the entire exterior of the building. Jo will also be responsible for the creation of the storyboard.
Elliot Dolton
Elliot will be constructing the lower section of the building. He will be solely responsible for the modelling and animation of the entire lower section. This will include building structure, interior constructions and furniture. Elliot will develop all of the animation that will be required as shown in the storyboard in the lower sections of the building. Elliot will also be responsible for the updates of the Group Blogger notes, as after this point onwards.
Oliver Dolton
Oliver will be developing and constructing the upper section of the building. This will also include all of the stairways, window pains and the right hand side of the lower section of the building, the section right off the cut through pathway. Oliver will be solely responsible for all of these sections construction and animation development. This will include all of the upper building structure, mapping textures and interior furniture. All of the animation featured in the storyboard that includes the upper section up the building and stairways will be developed by Oliver. Also the animated figure that will be used in the animation process will be prepared by Oliver and the research and write up of the Guildhall history.